The database of public procurement
Company
LOGISTIK SERVICE GMBH
LOGISTIK SERVICE GMBH from Linz has been awarded 27 public contracts since 2009, 7 of them EU-wide up to 2020 (as of 2 Oct 2026).
As of: · Source: official notices (Datenservice Öffentlicher Einkauf, CC0), EU Official Journal (TED) and procurement portals · How we count
Awards per year, 2009 to today
Up to 2023 from the EU Official Journal (only contracts above the EU thresholds), from 2024 from the Datenservice Öffentlicher Einkauf and the portals. 2025: €100,720 · 2026: €1,222,477. The current year is incomplete.
Timeline, 36 months
One dot per award in the month of the notice, sized by value, red when there was only one bid. Click a dot to open the notice.
The network around LOGISTIK
Contracting authorities
Planners and neighbours
Contracting authorities and neighbours from the award notices, planners from the office register, brands from the bills of quantities of the tender before the award. Figures are lots.
Competitors
With count, location and latest award, each with a profile. See everything with Pro
Who wins with the 4 most frequent contracting authorities of this company in Railway track construction, Electrical installations.
References: recently won
| Date | Lot | Contracting authority | Value | Bids |
|---|---|---|---|---|
| 13 Aug 2026 | Bestellung 4301015758Railway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €189,846 | 2 |
| 20 Jul 2026 | Knittelfeld; WN inkl. PLV W72, W73, W82-W85, W87, W88, WHZ, GN inkl. PLV Gl. 1 u. 2, km 224,350-225,394, Bau - Externe Montage für WN KnittelfeldRailway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €395,141 | 2 |
| 3 Apr 2026 | WNL Villach Westbahnhof - Villach Süd Gvbf inkl. GNL - Sich. techn. Montagearbeiten im Zuge der WNL Villach Westbahnhof - Villach Süd GvbfRailway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €200,197 | 3 |
| 13 Mar 2026 | BAI0.SAV837 Kirchbichl - Wörgl Hbf; WN inkl. PLV W109-119,124,131,138,143,144,161,850, Kreuzung 1+2, km 14,900-16,000 - WNL Wörgl: ST-Montage/Demontage sicherungstechn. EinrichtungenRailway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €249,984 | 3 |
| 25 Feb 2026 | Anschlussbahn Hafen Linz Erneuerung Lichtzeichenanlagen SicherheitstechnikRailway track construction · Source (Procurement portal) | LINZ SERVICE GmbH | €187,309 | 1 |
| 22 Sep 2025 | Ausbildung zum/zur Triebfahrzeugführer/inOther · Source (Procurement portal) | Raab-Oedenburg-Ebenfurter-Eisenbahn AG | €100,720 | 2 |
| 16 Nov 2020 | Wien Zvbf Weichenneulage W330-333, 335-337, km 6,200-6,390 - Sicherungstechnische Montagearbeiten im Zuge der Weichenneulage am Wien Zvbf W330-333, 335-337Railway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €70,335 | 2 |
| 5 Nov 2020 | Errichtung Gleisharfe Nord Graz - Graz, Errichtung Stellwerk für Produktion und Technische ServicesElectrical installations · Source (Procurement portal) | ÖBB-Holding AG mit allen verbundenen Unternehmen | 2 | |
| 8 Sep 2020 | Los 5 Lichtzeichenanlage - Ausbau IndustriezeileElectrical installations · Source (Procurement portal) | LINZ SERVICE GmbH | €845,616 | 3 |
| 18 Aug 2020 | Blockverdichtung Steindorf - Sicherungstechnische Montage Blockverdichtung SteindorfElectrical installations · Source (Procurement portal) | ÖBB-Infrastruktur AG | €169,601 | 2 |
| 24 Jul 2020 | Hilm-Kematen, Waidhofen a.d.Ybbs; Errichtung ESTW; Bau - Hilm-Kematen; ST MontageElectrical installations · Source (Procurement portal) | ÖBB-Infrastruktur AG | €99,962 | 2 |
| 19 Jun 2020 | Weichenneulage Bruck an der Mur - sicherungstechnische Demontage- und Montagearbeiten im Zuge der WNL Bruck an der MurElectrical installations · Source (Procurement portal) | ÖBB-Infrastruktur AG | €225,433 | 2 |
| 19 Jun 2020 | BAH301 Abflachung Rampe Süßenbrunn - Kabelendmontage - Abflachung Rampe Süßenbrunn - Kabelendmontage Signale und GleisfreimeldungenRailway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €245,491 | 1 |
| 29 May 2020 | SAT124; SAT123; SAQ170; SAS143 - Strecke Florisdorf-Retz, KabelspleißarbeitenRailway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €86,999 | 2 |
| 8 Apr 2020 | ESTW Lahrndorf und Ternberg - Sicherungstechnische Montage für das ESTW Lahrndorf und TernbergRailway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €315,567 | 2 |
| 15 Oct 2019 | SAS114 Floridsdorf Fbf, WN mit GDA,W310,311,312,313,314; km 6,533 - 7,126; BauElectrical installations · Source (Procurement portal) | ÖBB-Infrastruktur AG | €109,817 | 2 |
| 26 Aug 2019 | NA5520.78.03.S1I - Mürzzuschlag; Sicherungstechnische MontagearbeitenRailway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €244,914 | 2 |
| 5 Jul 2019 | Villach Süd Gvbf-Westkopf, WN 2019 W419-423 - Sicherungstechnische MontageRailway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €65,692 | 2 |
| 20 May 2019 | SAS119, Wien Penzing – Breitensee, GN Gl1+2; km 0,115 bis km 0,950, WN W122+123 - SAS119, Wien Penzing – Breitensee, GN Gl1+2; km 0,115 bis km 0,950, WN W122+123Electrical installations · Source (Procurement portal) | ÖBB-Infrastruktur AG | €64,828 | 2 |
| 30 Apr 2019 | SAS350 - Sicherungstechnische Montagetätigkeiten WNL ZVBf W151-155 und W352, 353Railway track construction · Source (Procurement portal) | ÖBB-Infrastruktur AG | €99,996 | 2 |
The 20 most recent of 20. All with Pro.
EU-wide awards 2006 to 2023
7 awards from 6 contracting authorities, €12,310,000 stated. The most frequent:
Year, contract, contracting authority, value and bids, each award with its source. See everything with Pro
From the EU Official Journal (TED), matched by company key; subsidiaries are not counted. Listed as “Logistik Service GmbH”, 3.7 bids on average.
Questions and answers
How many public contracts has LOGISTIK SERVICE GMBH won?
LOGISTIK SERVICE GMBH has received 20 contract awards from public tenders since 2019, most recently on 13 Aug 2026. The notices state a combined value of €3,967,448 (19 of 20 awards state a value). When the company won, there were 2.1 bids on average. The EU Official Journal also lists 7 EU-wide awards between 2009 and 2020.
Which contracting authorities does LOGISTIK SERVICE GMBH work for most often?
Most awards came from ÖBB-Infrastruktur AG (16), LINZ SERVICE GmbH (2) and Raab-Oedenburg-Ebenfurter-Eisenbahn AG (1). In total there are 4 contracting authorities.
In which trades does LOGISTIK SERVICE GMBH win public contracts?
Most awards fall under the trades “Railway track construction” (12) and “Electrical installations” (7). The trade is assigned from the CPV code and the title of the lot.